Company News

100tph mobile crushing station under installation

 
100tph mobile crushing station under installation  
Jaw crusher: 24”x36”
Cone crusher: 4FT 
Vibrating screen: 6’x20’, 3layers 
The mobile crushing station should be lubricated as required. Small and medium-sized equipment are mainly lubricated with grease and lubricating oil on a regular basis. In large-scale equipment, if cone and jaw crushers are used, there is generally a forced lubrication system. At this time, you should always pay attention to observe the oil temperature, oil pressure, flow and other parameters. Tighten loose fasteners. When the mobile crushing station is in operation, always pay attention to the noise and vibration of the equipment. If there is excessive noise or vibration, it should be shut down quickly for inspection. After troubleshooting, a no-load restart should be carried out in the starting sequence.
 

Tel: +86-21-68763311

Fax: +86-21-68763366

joyal@crusherinc.com

©2020 Shanghai Joyal Machinery Co., Ltd. All Rights Reserved.